Comissioning

The Commissioning process helped the Broadway Hotel achieve significant cost and energy savings in their 7 story hotel. Pumps that distribute heating-cooling water to heat pumps were changed from 40 HP to 20 HP. A backup pump was added to increase reliability of this key component.